Transdisciplinarity Enabled
Operation | Weather window [h] | Significant wave height [m] | Wind speed [ms −1 ] | Duration [h] |
---|---|---|---|---|
Loading at port | 23 | - | 14 | 23 |
Transit offshore | 18 | 2.5 | 18 | 12 |
Infield transit and jack up | 18 | 2 | 18 | 3 |
Installation | 3 × 10 | - | 14 | 49 |
Jack down | 15 | 2 | 18 | 2 |
Transit to port | 15 | 2.5 | 18 | 11 |