Skip to main content

Transdisciplinarity Enabled

Earth Perspectives Cover Image

Table 7 Possible constraints for the Ridge Park MAR scheme

From: Framework for the optimization of operation and design of systems with different alternative water sources

Constraint Value
Glen Osmond Creek Environmental Flow >2 L/s
Aquifer Extraction in Summer <80% of Injection Volume
Pressurized System Demands >15 ML/year
Gravity System Demands >37 ML/year